Risk Management in Libyan Construction Projects During Times of Political Unrest

Authors

  • Mohamed. M. Mohamed Dwa Higher Institute of Petroleum Technique - Department of Gas and Oil - Ubari – Libya Author

Keywords:

Libya, Project Delays, Security Risks, Corruption in Construction

Abstract

This study aims to examine risk management in Libyan construction projects during periods of political unrest, measuring the frequency and severity of political, security, economic, and logistical risks, identifying effective mitigation strategies, and assessing stakeholder perceptions. Using a mixed — methods approach—including surveys of 150 construction firms, interviews with key stakeholders, and statistical analysis—the research evaluates how political instability disrupts project timelines, budgets, and safety . Findings reveal that 82 % of projects face political unrest — related delays (averaging 7 .2 months), while currency fluctuations contribute to the highest cost overruns (35%). Militia interference affects 68 % of projects, increasing costs by 15 %. Effective mitigation strategies include dollar — denominated contracts (reducing overruns by 9 %), tribal negotiations (83 % success rate), and modular construction(30–50 % delay reduction ). Stakeholder priorities diverge, with investors favoring external guarantees (e .g., World Bank insurance ) and governments advocating local solutions . The study recommends that firms adopt hybrid contracts, preposition materials, and engage local Communities, while Libyan authorities should streamline permitting, strengthen judicial enforcement of contracts, and implement anti — corruption measures like block-chain tendering. International partners can support political risk insurance and modular construction training. The findings underscore the need for adaptive, context — specific risk management in conflict zones, combining immediate operational adjustments with long — term institutional reforms to enhance project resilience

Downloads

Download data is not yet available.

References

Al-Hadhrami, L., & Oladokun, M. G. (2021). Risk management in post — conflict construction projects: A case study of Libya. International Journal of Construction Management, 21 (8), 789–801.

Al — Kharashi, A., & Skitmore, M. (2017). Risk factors affecting construction projects in the Middle East: A comparative study. Construction Innovation, 17(3), 321–340.

Al — Mabrouk, K. (2021). Risk assessment in Libyan construction projects during political instability [Unpublished doctoral dissertation]. University of Tripoli.

Assaf, S. A., & Al-Hejji, S. (2018). Causes of delay in large construction projects: The case of Libya. Journal of Management in Engineering, 34 (2), 05017009.

Belassi, W., & Tukel, O. I. (2016). A new framework for determining critical success/failure factors in projects. International Journal of Project Management, 14 (3), 141-151.

El — Gohary, K. M., & Aziz, R. F. (2019). Risk management in construction projects in unstable environments. Routledge.

El — Mashaleh, M., & Odeh, A. (2020). Political instability and its impact on construction project performance in developing countries. Journal of Construction Engineering and Management, 146 (5), 04020035.

International Crisis Group. (2019). Stabilizing Libya: The role of infrastructure projects in peacebuilding. https://www.crisisgroup.org/middle — east — north — Africa/North — Africa/Libya

Libyan Ministry of Housing and Infrastructure. (2022). Annual report on construction sector challenges in Libya. http://www.housing.gov.ly

Loosemore, M., Raftery, J., Reilly, C., & Higgon, D. (2018). Risk management in projects (3rd ed.). Routledge.

Project Management Institute. (2021). PMBOK guide: A guide to the project management body of knowledge (7th ed.). Project Management Institute.

Transparency International. (2021). Corruption risks in post — Gaddafi Libya. https://www.transparency.org/en/countries/libya

United Nations Development Programme (UNDP). (2020). Rebuilding Libya: Challenges in infrastructure development. https://www.undp.org/libya

World Bank. (2020). Libya economic update: Navigating through conflict. World Bank Group. https://www.worldbank.org/en/country/libya/publication/libya — economic — update

Zwikael, O., & Ahn, M. (2019). The effectiveness of risk management: An analysis of construction projects in conflict zones. International Journal of Project Management, 37 (5), 701-715.

Downloads

Published

30-06-2025

Issue

Section

Original Articles

Categories

How to Cite

Risk Management in Libyan Construction Projects During Times of Political Unrest. (2025). Libya Journal of Applied Sciences and Technology, 13(1), 135-150. https://www.ljast.ly/ojs3504/index.php/ljast/article/view/60